logo
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

WUXI XUETAO GROUP,EXCHANGE HEART FOR TRUST

PROFESSIONAL INDUSTRIAL PLATFORM
<
>

Epidemic prevention & return to work

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-02-14 16:12
  • Views:

(Summary description)

Epidemic prevention & return to work

(Summary description)

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-02-14 16:12
  • Views:
Information
In response to the request of the Wuxi Municipal Party Committee and the Municipal Government for the prevention and control of the epidemic and the rapid restoration of production, CXTCM established an epidemic prevention and control team on February 3, with Mr. Zhang Hua, general manager as the leader and managers from other departments as members. They actively carry out prevention and control work. In accordance with the guidance of local gorvement and the actual situation of the company, a Manual of Epidemic Prevention and Control was compiled. The company carried out comprehensive and thorough disinfection in advance, prepared sufficient prevention and control materials, and received the first batch of replies from Wuxi after acceptance by higher-level departments Industrial enterprises resumed production on February 10.
After return to work, all employees were educated according to the Manual. Have paper records with details information for all returnees, thoroughly disinfect all places, comparatively isolate different workshops, measure temperature for all persons, separate dinning time and one person one desk, etc. With so many measures, the company tries best to offer a safe healthy working environment for everybody.
With all these efforts, we will try our best to protect from the epidemic and orderly arrange production to fulfil orders without delay.
 
 
 
 
 
Search
Check category
xuetao
xuetao

ADD: 501# DaTong Road, Binhu Economic Technological Devel- opment Zone,Wuxi City , Jiangsu Province ,China

TEL:0510-85625666
0510- 85627666

Mobile: (0)13585071888

Zip Code: 214131

Fax: 0510-85607997

E-mail: webmaster@wxxuetao.com

 Asphalt feeding tank
Asphalt feeding tank
Asphalt feeding tank
 Melting equipment used for debarreling bitumen
Melting equipment used for debarreling bitumen
TechnicalparametersofMeltingequipmentusedfordebarrellingbitumen:TechnicalTypeOutout(t/h)Power(kw)Debarrellingvolum(m3)Storagevolum(m3)Speedforfeedingbarrel(min/time)QX.YRL.TD-102.538101.5QX.YRL.TD-205
 Asphalt deoil and dewater tank
Asphalt deoil and dewater tank
Asphalt deoil and dewater tank
 Large-scale asphalt storehouse
Large-scale asphalt storehouse
Large-scale asphalt storehouse
 Large-scale asphalt storehouse
Large-scale asphalt storehouse
Large-scale asphalt storehouse
 Large-scale asphalt storehouse
Large-scale asphalt storehouse
Large-scale asphalt storehouse
 Bulk feed tank asphalt
Bulk feed tank asphalt
Bulk feed tank asphalt
 Asphalt heating storage tank (horizontal)
Asphalt heating storage tank (horizontal)
Asphalt heating storage tank (horizontal)
 Emulsified asphalt
Emulsified asphalt
MaintechnicalparametersofemulsifiedasphaltNO. Name Type/parameters/size remark 1 Type LRS-6  2 Output 1~6t/h   3 Mainframe L*W*H=7900*2000*2200mm  4 Hot-watertank capacity 4.0m3  size L*W*H=1800*2000*

Wuxi Xuetao Group Co., Ltd.

雪桃